ASME Sec VIII Div 1 · Filter Manufacturer

Quality assurance and testing

Failure of a filtration unit in service carries a cost substantially greater than the unit itself. Every item dispatched from our facility has been subject to stage and final inspection against a quality assurance plan agreed before fabrication commences.

Design Codes

Built to the code your inspector will check

Pressure vessels are designed and constructed to ASME Section VIII Division 1. Where the duty falls under Indian Boiler Regulations, equipment is built to IBR and the associated documentation is provided. Other national and international codes are accepted on request, with confirmation of certification capability provided at the enquiry stage.

Three way and multiport valves are designed, manufactured and tested in accordance with BS 5251 Section One, BS 6755 Part 1, API 598 and API 6D.

Incoming Material

Verified before it reaches the shop floor

Plate, pipe, bar and fittings are procured against specification and verified on receipt for grade, dimension and accompanying documentation. Material test certificates are retained and issued with the equipment. Where certification to EN 10204 3.1 or 3.2 is required, this is specified at the order stage and traceability is maintained throughout fabrication.

Inspection & Testing

Examination carried out against the specification

Applied to the extent required by the design code and the order — not every examination applies to every unit.

Radiographic testing (RT)Weld integrity on pressure retaining seams, to the extent required by the code and the customer specification
Ultrasonic testing (UT)Plate and weld examination where radiography is impractical or additional verification is required
Dye penetrant testing (PT)Surface breaking defects on welds and machined surfaces, particularly on austenitic stainless steel
Magnetic particle testing (MP)Surface and near surface defects on ferromagnetic materials
Hydraulic testPressure retaining capability at the test pressure derived from the design pressure
Pneumatic testApplied where the service does not permit water, and for leak detection at assembled joints
Pressure drop testVerification that the completed unit meets the pressure drop stated in the offer at design flow
Dimensional inspectionAgainst the approved general arrangement drawing, including flange face to face dimension and bolt hole orientation
Visual inspectionWeld appearance, surface finish, cleanliness and internal condition
Coating verificationSurface preparation, coat sequence and dry film thickness against the specified paint system
Third Party Inspection

Accommodated as standard

Inspection by the customer or by a nominated third party agency is accommodated as standard and is planned into the manufacturing schedule. The appointed agency and the required hold points are confirmed at the order stage and incorporated into the quality assurance plan. We have worked with the major independent inspection agencies used across the process industries, and will work to whichever agency your specification nominates.

Documentation

Issued with every unit

Equipment is dispatched with the documentation appropriate to its duty. This ordinarily comprises the approved general arrangement drawing, material test certificates, the test report, the quality assurance plan with inspection endorsements, and the operation and maintenance instruction. Where a full data book is required by the order, it is compiled and submitted for approval prior to dispatch.

FAQ

Common questions

Yes. ASME Section VIII Division 1 is the design code applied as standard, and equipment is built to IBR where the duty falls under Indian Boiler Regulations. Other national and international codes are accepted on request, with certification capability confirmed at the enquiry stage.
This depends on the examination and the order requirement. Send us the specification and we will confirm the route — in house facility or an approved agency — before the order is placed.
Yes. Inspection by the customer or by a nominated third party agency is accommodated as standard and is planned into the manufacturing schedule. The appointed agency and the required hold points are confirmed at the order stage and incorporated into the quality assurance plan.
Equipment is dispatched with the approved general arrangement drawing, material test certificates, the test report, the quality assurance plan with inspection endorsements, and the operation and maintenance instruction. Where a full data book is required by the order, it is compiled and submitted for approval prior to dispatch.
Yes. Certification to EN 10204 3.1 or 3.2 is provided where specified at the order stage, and traceability is maintained throughout fabrication.
Yes. A quality assurance plan setting out the inspection stages, hold points and applicable test methods is agreed before any material is cut. Where a customer or third party inspector is involved, the QAP is agreed with them directly and forms part of the documentation issued with the unit.